Welcome to Jane and John's Photo Gallery!
Deutsch | English (US) | Español | Français | Magyar | Română

Pumphouse expansion

We wanted to overhaul our water system and add a softener and filter so it was necessary to add on to the original little 4' by 4' building. We build a new 8' square building adjacent to the little one and grafted them together - wow what a project for such a little building. Took us 12 days to do the construction and I hired out the roof shingling. (We still need to caulk, paint, and insulate!!)

Language preference

Deutsch | English (US) | Español | Français | Magyar | Română

Random image

Language preference

Deutsch | English (US) | Español | Français | Magyar | Română

Language preference

Deutsch | English (US) | Español | Français | Magyar | Română